Boards and sections for site work
Random-width boards, fixed-width boards and timber sections for concrete formwork. Scaffold boards and toe boards are also available, to be selected for the intended use.
Construction timberSearch Vela
A few places to start
For contractors and general contractors
Timber, panels, insulation and hardware in one order. We prepare components and arrange deliveries around the agreed stages of work, giving you fewer separate supplies to coordinate.
What you can request
Random-width boards, fixed-width boards and timber sections for concrete formwork. Scaffold boards and toe boards are also available, to be selected for the intended use.
Construction timber
OSB/3 for sheathing timber-frame walls, roofs and floors. Formwork panels shape concrete as it is poured; the surface and panel type are chosen to suit the job.
Explore OSB/3
Solid timber and glulam beams for roofs, floors and other structures. Boarding, matchboards, insulation and connection hardware can complete the order.
For structural and safety-related uses, materials, sections and documentation must be checked against the project requirements.
Machining
Cutting to size, shaping and manual or CNC machining prepare beams and components according to the drawings for the job.
You can request supply only or add the machining you need. For roofs and timber structures, we also assess assembly and installation according to the work involved.
We provide design and sizing support. Documents that require a professional signature are entrusted to external qualified professionals.
We agree how to split and prepare loads as work progresses. Access and unloading arrangements are established before transport is organised. You can also collect the material from us.
Arranging deliveryA real project · Sienese hills
During the complete refurbishment of floors and roofs in a complex of historic buildings, a general contractor had limited handling space and external installation teams to coordinate.
We organised beams, purlins and boarding by building section, floor bay and roof area. Components were numbered, cut to size where needed and delivered in phases.
Getting started
Describe the work and the stages you would like us to handle. If you already have a bill of quantities, a materials list or drawings, mention them in your enquiry.
Let’s discuss it
Availability, services, documents and lead times are confirmed in the quotation.